Assembly 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Ethan C.

  • 3/15/2019

  • 3 hours

  • Aquiferland

  • Solomia D.


Notes

we need to print a lot of spares

Work Completed

- replaced broken part on hatch

- began replacing broken stuff on cargo arm but the 3d printed bearing/shaft holder broke again so we are printing a new one.

- added locktite to all bolts on climber - need to make sure to do this at CIR, they are all very loose

- on front climber: loosened couplers from climbing mechanism so that the thrust bearings were less compressed

Challenges

- broken 3d printed parts

- we have no tools (somebody ate all of them or something. i dont know where a single mustard bottle is)

 

Work for Next Meeting

- loosen back thrust bearing  (edit by bob.  Remove all couplings and install some washers on top of hex shaft.  Tighten 1/4-20 bolt securing coupling to hex shaft and be sure shaft rotates freely.)

On Schedule?

yes