Edit

Note Viewer


Meetings 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Anna O.

  • Sam K.

  • Adam P.

  • Billy D.

  • Bob S.

  • Chris E.

  • Michal O.

  • 10/1/2019

  • 2 hours

  • Aquiferland

  • Michal O.

Guests

Elan, Ella G, Gabe, Jeana, Mark H, Zafar, Charlie, James,


Work Completed

Atla-Z chain and replaced masterlink and small bolt

Saba-Z removed back stilts and one back ball screw bracket

Frisbee - replaced moved limit switch and rewired it

Challenges

Atla-Z 1)

Saba-Z 1) ball screw 3d printed bracket broken

2) fix hatch mechanism:

3) fix ground connection to the Power distribution panel

4) remove front stilts

Octa drivetrain

1) ferrell connectors

2) attach front wheel

3)

Frisbee - frame is cooked say James, Elan

Work for Next Meeting

Atla-Z 1)

Saba-Z 1) ball screw 3d printed bracket broken

2) fix hatch mechanism:

3) fix ground connection to the Power distribution panel

Octa drivetrain

1) ferrell connectors

2) attach front wheel

3) finish wiring and attach main switch

Frisbee - frame is cooked say James, Elan

On Schedule?

Saba-Z on schedule on Boiler Bot competition on 10/26