  • Anna O.

  • David S.

  • Mayank H.

  • Nhan T.

  • Shashank H.

  • Adam P.

  • Michal O.

  • 10/8/2019

  • 2.5 hours

  • Aquiferland

  • Michal O.

Guests

Zach, Elan, Jeana, Stefania, Mark


Work Completed

  • Atla-Z: omni wheels re-attached
  • Octa drivetrain: new wheels and wiring?
  • Building FLL field setup kits
  • Saba-Z: checked wiring on power distribution panel - wire ferrule issues?
  • ?

 

 

 

Challenges

LEGO parts

Work for Next Meeting

  • Route turret parts
  • power tool training
  • self-directed training
  • Build 4 FLL field setup kits - The printed instructions are in a fedex box on the FLL table (which I cleaned off).  One kit is on the table and the other 3 are on what used to be the Invader Bots FLL pallet. See Bob for details.
  • Rebuild the FLL tables for the qualifier and championship. See Bob for details.
  • Atla-Z 1) attach elevator to the chain if we have the small bolts (ordered)
  • Saba-Z FIX for the Boiler Bot 1) check and/or fix ground connection to the Power distribution panel, 2) replace two broken bumper bolts (51/5-6" long, make sure there is enough thread - we have the bolts in the shop - 89.7% :-)) 3) replace (cut, route) Lexan triang. piece  on the front right side above bumpers - the one which prevents the robot to drive "under" the cargo ship and gets stuck if someone drives really hard)
  • Octa drivetrain 1) fix Wire ferrule connectors (ordered? we need Wire ferrules yellow 10mm, we have 8mm, too short) on Rio if we have them (we probably don't), 2) wiring, connect RoboRio, 3) find 2 encoders and PRINT one encoder bracket (the drawing is in the SolidWorks somewhere, ask Chris please where it is)
  • Frisbee - ?
  • Assemble another Metal shelf rack including plastic T-pieces (need shimming inside by the rasp)
  • Driving practice

On Schedule?

Boiler Bot competition 11/16: Yes