Edit

Note Viewer


Meetings 2019

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Jonathan L.

  • Michal O.

  • 10/26/2019

  • 2.5 hours

  • Aquiferland

  • Michal O.

Guests

Gabe, Zafar, ?, James, Jeana, ?, Poori - mentor, Gabe's dad


Work Completed

Saba-Z

  1. Hatch panel bracket replaced?
  2. DT encoder harvested, the bracket was broken.
  3. The wheels (blue/orange) on the stilts replaced.

Octa

  1. 2 encoders and gears, brancket ready for assembly.

Challenges

Button bolt on the stilts' shaft stripped .....

Work for Next Meeting

  • Route turret parts
  • power tool training
  • self-directed training
  • Finish 2-4 FLL field setup kits - The printed instructions are in a fedex box on the FLL table (which I cleaned off).  One kit is on the table and the other 3 are on what used to be the Invader Bots FLL pallet. See Bob for details.
  • Rebuild the FLL tables for the qualifier and championship. See Bob for details.
  • Atla-Z
    • 1) route and replace chain mount on elevator  
    • 2) attach elevator to the chain if we have the small bolts (ordered)
  • Saba-Z FIX for Boiler Bot (11/16)
    • 1) check and/or fix ground connection to the Power distribution panel (wiring - bare wires right now, wait for yellow ferrules or switch to solid wire)
    • 2) route and replace Lexan triangle pieces on the front right side above bumpers - the one which prevents the robot to drive "under" the cargo ship) 
    • 3) Check if correct/rewrite driver control boards on the control sheets for Station 1 and 2. This is for new students to get familiar with the control layout.
    • 4) Replace hatch panel bracket - DONE?
  • Octa drivetrain
    • 1) wiring, connect RoboRio,
    • 2) Attach Encoders to Octa's DT gearboxes
  • Driving practice

On Schedule?

Boiler Bot Battle is coming in < 3 weeks (5 shop meetings - effectively 4, with 11/9 FTC meet)!!!