Edit

Note Viewer


CAD & Integration 2020

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Dina H.

  • James B.

  • Jonathan L.

  • Chris E.

  • 1/14/2020

  • 2.5 hours

  • Aquiferland

  • Dina H.


Work Completed

- gearbox is nearly completed 

    - fixed gear ratios

    - fixed geometry so that the bolt connecting the plate to the motor is more easily accessible

- started assembly for drivetrain frame

- worked on turret CAD

- completed geometry for intake

Challenges

- not sure on where to place holes for bolts that hold plates together

- need more communication between subteams to finalize position of all subsystems

Work for Next Meeting

- finish the gearbox & full drivetrain assembly

- Make a "crayola CAD" model of the robot with each subsystem as a blocky object just to see how everything will fit on the robot

 

On Schedule?

On schedule to finish drivetrain by end of this week