Edit

Note Viewer


CAD & Integration 2020

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Dina H.

  • James B.

  • 1/20/2020

  • 4 hours

  • Aquiferland

  • Dina H.


Work Completed

- added cams & bolts for cams into the drivetrain assembly

- added bumper supports to the drivetrain frame & weightholed them in order to satisfy the 8" maximum limit of empty space on the drivetrain frame

- ordered all parts for the drivetrain on the BOM

- Finished CAM for the gearbox plates

Challenges

- had some trouble setting up CAM on SolidWorks on the CAD PCs

Work for Next Meeting

- Make a "crayola CAD" model of the robot with each subsystem as a blocky object just to see how everything will fit on the robot

- Continue CAM on other extrusions

- Start CAD on other subsystems

 

On Schedule?

Yes