Assembly 2020
Students
Mentors
Date & Time
Location & Author
Zade L.
Aquiferland
Lukas G.
Work Completed
- finished attaching the tread to one of the wheels and began another wheel until we ran out of rivets
- assembled more wheels until we ran out of hubs
Challenges
- screwing the bolts in the wheels took a long time as we were doing it by hand
Work for Next Meeting
- assemble the remaining wheels for the second drivetrain (all of the wheels are assembled for the first drivetrain excluding the tread), ASK if we are actually building the second DT
- attach the tread to all of the wheels including the main drivetrain wheels
- Secondgearbox set: assemble