Edit

Note Viewer


Assembly 2020

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Edan E.

  • Gabe C.

  • Lukas G.

  • Zade L.

  • 2/13/2020

  • 3 hours

  • Aquiferland

  • Lukas G.


Work Completed

  • finished attaching the tread to one of the wheels and began another wheel until we ran out of rivets
  • assembled more wheels until we ran out of hubs

Challenges

  • screwing the bolts in the wheels took a long time as we were doing it by hand

Work for Next Meeting

  • assemble the remaining wheels for the second drivetrain (all of the wheels are assembled for the first drivetrain excluding the tread), ASK if we are actually building the second DT
  • attach the tread to all of the wheels including the main drivetrain wheels
  • Secondgearbox set: assemble

On Schedule?

yes