Edit

Note Viewer


Assembly 2020

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Elan P.

  • Gabe C.

  • James B.

  • Malia F.

  • Chris E.

  • Zade L.

  • 2/15/2020

  • 3 hours

  • Aquiferland

  • Elan P.

Guests

Vasista was there too


Work Completed

  • Assembled drivetrain - tested motors on the drivetrain.
  • Grease the gearbox, chain and bearings.
  • Chain tensioned.

Challenges

One wheel had hubs screwed on at an angle so it didnt quite fit on the shaft.

Another wheel is old, leave it there before we get the correct 1/8"-1" rivets

Work for Next Meeting

  • assemble the remaining wheels for the second drivetrain (all of the wheels are assembled for the first drivetrain excluding the tread), ASK if we are actually building the second DT. Answer Not now, focus on the first DT.
  • attach the tread to all of the wheels including the main drivetrain wheels.
  • Secondgearbox set: assemble

On Schedule?

probably behind