  • 2/16/2020

  • 3 hours

  • Aquiferland

  • Sarah H.


Work Completed

cut hex shaft for robot

Ordered: Hex shaft for robot + bolts (We ordered 4-20 1/2", 3/4" and 7/8", each 25 with flanges)

In progress: 3d parts for the climber + routing for the shooter

Challenges

look below

Work for Next Meeting

  • assemble the remaining wheels for the second drivetrain (as spare ones), ASK if we are actually building the second DT. Answer Not now, focus on the first DT.
  • attach the tread to all of the wheels including the main drivetrain wheels.
  • If nothing else to do: Second gearbox set: assemble

Added by Sarah:

1. Each subsystem captain must confirm that they have ordered all the parts they need for their subsystem. We are already behind and without pieces we will get even more behind. Need confirmation from Shooter, Turret, Indexer, Intake, Electrical

2. All three 3d pieces that need to get printed should A. be put on an excel sheets as a queue B. their .stl files should be put on a group folder

 

On Schedule?