Edit

Note Viewer


Assembly 2020

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Anna O.

  • 2/21/2020

  • 3 hours

  • Aquiferland

  • Sarah H.


Work Completed

on climber part half of the gear box is assembled and on the table with wheels.

Challenges

custon 1.14 spacers are not made for the gearbox

Work for Next Meeting

  • assemble the remaining wheels for the second drivetrain (as spare ones), ASK if we are actually building the second DT. Answer Not now, focus on the first DT.
  • attach the tread to all of the wheels including the main drivetrain wheels.
  • If nothing else to do: Second gearbox set: assemble

Climber: assemble climber gearbox + 3d print those spacers

 

On Schedule?

no