Shooter 2020

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Edward K.

  • Elan P.

  • Erika F.

  • James B.

  • Jonathan L.

  • Mark H.

  • Adam P.

  • Billy D.

  • 2/22/2020

  • 3 hours

  • Aquiferland

  • James B.


Work Completed

  • Deburred and tapped .25" plates
  • Tapped needed printed parts
  • Assembled hood and attached to the turret
  • Sand the slots in the hood, and the sliding rod
  • Discovered that there isn't room for a separate accelerator wheel motor, so it will now be driven off of the shooter wheel shaft.

Challenges

  • 12-24 tap that we have isn't great, pushes material rather than cutting
  • Change in accelerator motor means that we are now waiting on a shipment from Vex and McMaster (McMaster shipment isn't related to the change in plans, it is James overlooking a few bolts)

Work for Next Meeting

  • Wrap wheel in safety wire.
  • Clean printed parts that need it
  • Generate CAM for parts (on GrabCAD, parts status, materials, and quantities are here, https://docs.google.com/spreadsheets/d/1nhX6S25NavYOcySds280c88igzgOpNe1pfYLBGypIbA/edit#gid=0)
    • 2032
    • 2033
    • 2035
  • Route parts
    • 2032
    • 2033
    • 2035
    • 2040

If the above is done,

  • Take apart and reassemble the 5:1 Bag motor labeled as "bad" (or something like that)
  • Mount servo, pot, turning motor, turning pot
  • The easiest way to fully fix the hood is to shim off the parts of the sliding rod.

On Schedule?

NO, scheduled to complete Tuesday.