Edit

Note Viewer


Climber 2020

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Reese P.

  • Adam P.

  • Bob S.

  • 2/23/2020

  • 3 hours

  • Aquiferland

  • Reese P.

Guests

thomas doherty, jake allen, dina H


Notes

talk to Bob about routed parts next time.

Work Completed

attached a horizontal bar to a vertical one, then attached a smaller vertical one by the end of the horizontal one.

Challenges

the next gussets we need are not routed yet, so we had to stop. also the holes on the smaller vertical bar we attached did not align correctly with the gussets.

Work for Next Meeting

1. assemble rest of gearbox (with brake) & attach to indexer assembly

2. Continue finding parts and putting them on the bom

3. Find out if next gussets have been routed

On Schedule?

probably