intake, indexer (need the 3" 1/4 20 bolts and pins) I would say 99% assembled they need to be attached to the drivetrain, but need to wait for electrical until we are able to do that.
climber update: need to put the springs on the three 3d printed parts and put dowls and spacers in while waiting for the pieces to get routed.
CAM and routing: looking at spread sheet two more things need to get cammed + 4ish parts routed.
router wasn't cooperating/ tried to route and it failed
- 3d parts climbers add the dowel + spacers + springs onto them
-need the parts routed
- finish putting together indexer frame + put together climber rotation point assembly
no