-Attached spacers and dowels into climber 3d parts
-contructed ramp at the end of the night.
- intake done
- indexer (needs those placeholder bolts replaced)
climber small bearing dont fit on dowel will probably need to order new one/ I need to talk to chris to make sure
- 3d parts climbers parts need to be routed
- place climber rotation point assembly with ramp onto the drivetrain
no