Edit

Note Viewer


Assembly 2020

Attendance

Note Info

Students
Mentors
Date & Time
Location & Author
  • Anna O.

  • 2/28/2020

  • 3 hours

  • Aquiferland

  • Sarah H.


Work Completed

-Attached spacers and dowels into climber 3d parts

-contructed ramp at the end of the night.

- intake done

- indexer (needs those placeholder bolts replaced)


 

Challenges

climber small bearing dont fit on dowel will probably need to order new one/ I need to talk to chris to make sure

 

Work for Next Meeting

  • If nothing else to do: Second gearbox set: assemble

- 3d parts climbers parts need to be routed

- place climber rotation point assembly with ramp onto the drivetrain

 

On Schedule?

no