ROUTER:
Slack: 3:09pm Gussets are running.
Slack: 3:09pm Did the side rails get routed, or are those after the gussets?
Slack: 3:18pm After gussets.
Guessing this is the 12th DriveTrain gearbox plate (+ redo of messed up gearbox plate) + 6 DT gussets
Guessing run time is 1 hour.
Slack: 9:55 T1 still needs to be run on this face, decided to call it a day -- DT side extrusion (01001) pic shows .25 of part done.
Guessing this is the 4th of 4 side pieces, assuming #3 got finished today: so 1 hour run time for 2.25 -> 3.25 side pieces done
-
--